Cheaper & Faster
“The cost is absolutely clear cut because there's a savings straight away of something in the region of a minimum of €200m, because on the St James’s site you've a whole series of problems, you've excavation, you've relocation, you've drainage problems. Secondly in terms of speed, access to a site like St. James’s is very difficult, you would need to excavate 3 storeys underground and shift a lot of earth and it's going to be a very slow process.”
– Jimmy Sheehan, Orthopaedic surgeon and founder of three adult hospitals; the Blackrock, Galway and Hermitage Clinics
St James’s | Connolly |
|
|